EMPLOYMENT 1980 -1983 6/18

Position : Maintenance executive

Description:

  • I used my autonomy in bringing pipe mills.organizational changes made before to plate mills.
  • proceeded also to prepare disposal of plate mill No. 1,  maintenance sidet .
  • designed and made many changes to plate mill no. 2 and provided specifications and materials needed to buy the new stand of plate mill nr . 2 , for the defect discovered in 1978, and planned the work of rolling mill stand replacing.
  • in addition planned also some interventions in the pipe mill No.2 to the 47000 tons 'O' press damaged beam and it's hydraulic components.
  • In the rolling mill No. 2, together with CSM - IMaterials Development Center (Rome) technicians , an advanced acoustic detection and calculation of fracture's progress was installed to control and predict THe remaining stand life.
    This way , limiting rolling loads, they planned production and residual duration, allowed the plant to arrive up to the great maintenance stop without production loss .

    During this period had opportunity to participate in the study and implementation of the second step of e maintenance rationalization. (master maintenance plan)