-
1974 - England - Newcastle Upon Thyne - International Congress on submerged arc welding. Presentation
of a memory about tenacity of automatic multielectrode submerged arc weldings (together with researchers of CSM of Rome)
-
1982 - Sweden - Different
towns in north and south of the country. Testing and accepting welding machines built for the ITALSIDER longitudinal pipe works n. 2 of Taranto - Italy
-
1983 - Japan - Nippon Steel Co - permanence at Kimitzu. Interchange and cooperation
between italsider S.p.a. and Nippon Steel Corp. Seminars about industrial heavy hot plate mills and cold rolling plants, with reference to maintenance and operation.
-
1980 - 1986 - Some missions in Germany and France ( Mannesmann
- RexroTH - Thyssen - Linde - Siempelkamp installations and mills, and a pipe mill in Metz - France) having technical-commercial negotiations an testing machines
or components bought for Italsider - Nuova Italsider - ILVA
-
May 1995 - Rep. pop.
of China - fo TFME in Guangzou
(Canton University) province of Guangdong - Southern China where I
held lessons about maintenance and one week seminar for students
professors, engineers and technics of the environment, as subject
how to improve the working ratio of industrial mills installations
following a computerized maintenance system based on the statistic
theory of unavailability, simplified and applied to 'on condition'
maintenance programming'. The University has published the papers.
-
October - November 2001 - Perù
(UDEP de Piura) During my stayin Piura I held lessons
for students in e Engineering Faculty, and also for some professors. The subject was maintenance of industrial mills following a computerized
maintenance system based on the statistic theory of unavailability,
simplified and applied to 'on condition' maintenance. . Together with
3 new engineers I've written a text in Spanish, for use of study..
I've also revised some points of study plan of superior technical
school.
-
October - November 2001 - Perù
( Oil Refinery of Talara ) Held a seminar of 10 days for enginneers
and inspectors of that installation. Subject: same as the previous one..